Репозиторий Dspace

Optimization of the production plan of drill bits with fuzzy constraints based on a heuristic method

Показать сокращенную информацию

dc.contributor.author Orazbayev, B B
dc.contributor.author Ospanov, Ye A
dc.contributor.author Orazbayeva, K N
dc.contributor.author Kulmagambetova, Zh K
dc.contributor.author Seidaliyev, A A
dc.contributor.author Smailova, U M
dc.date.accessioned 2024-12-12T04:42:46Z
dc.date.available 2024-12-12T04:42:46Z
dc.date.issued 2021
dc.identifier.issn 1757-899X
dc.identifier.other doi:10.1088/1757-899X/1047/1/012004
dc.identifier.uri http://rep.enu.kz/handle/enu/20125
dc.description.abstract The problem of optimizing the production plan under fuzzy constraints is formulated using the theory of fuzzy sets. To solve the obtained fuzzy optimization problem, a heuristic method is proposed, in which, on the basis of the use of expert information and the knowledge of experts, the decision-maker in the optimization process and the choice of the best solution, it makes possible to improve the solution of the fuzzy problem. The results obtained are implemented and applied when solving the problem of optimizing the production plan of a plant for the production of diamond drill bits under fuzzy constraints. It is shown that when solving the optimization problem based on the proposed fuzzy approach, the plant's profit from the sale of different types of bits increases to 8%. ru
dc.language.iso en ru
dc.publisher IOP Conference Series: Materials Science and Engineering ru
dc.relation.ispartofseries 1047 (2021) 012004;
dc.title Optimization of the production plan of drill bits with fuzzy constraints based on a heuristic method ru
dc.type Article ru


Файлы в этом документе

Данный элемент включен в следующие коллекции

Показать сокращенную информацию

Поиск в DSpace


Просмотр

Моя учетная запись